The TIP identifies the priority highway and transit improvements programmed for advancement within a four-year period. Individual capital improvement projects must be included on the TIP in order to receive federal funding. Small-scale or undefined projects, in some cases, have not been identified individually, but have been grouped into representative line items based on the type of project.
Although the TIP covers a period of four years, the program goes through an update every two years and is modified continuously as projects are designed and constructed. These changes are made through a YAMPO approval process.
2013-2016 Transportation Improvement Program (TIP)
(Active from October 1, 2013 - September 30, 2016)
About the Tip Process
2013 TIP Bridge Candidates (Map)
2013 TIP Highway Candidates (Map)
2013-2016 Highway/Bridge Description
2013-2016 Highway TIP
2013-2016 Interstate TIP
2013-2016 Transit TIP
2013-2016 Transit TIP Narrative
Transit Financial Capacity
2017-2035 Capital Improvement Plan
PennDOT-YAMPO 2013-STIP-TIP MOU
Air Quality Conformity Report Vol I 2013-2016 TIP
Air Quality Conformity Report Vol II 2013-2016 TIP
2013 - 2016 TIP - Environmental Justice Summary
2011-2014 TIP
(Active from October 1, 2010 - September 30, 2012)
In June of 2010, the York Area Metropolitan Planning Organization (YAMPO) adopted an update of the 2009-2012 TIP. This update covers the period of 2011-2014 and is commonly referred to as the 2011 TIP.
For an Interactive Map of Projects click here.
TIP Administrative Procedures
2011-2014 Highway Project Map
2011-2014 Bridge Project Map
Approved Projects Not Shown on the 2011-2014 TIP
2011-2014 Highway (Non-Interstate) and Bridge TIP
2011-201 Highway (Non-Interstate) and Bridge Project Narrative
2011-2014 Interstate Management Highway and Bridge TIP
2011-2014 Interstate Management Highway
and Bridge Project Narrative
2011-2014 Transit TIP
2011-2014 Transit Project Narrative
Air Quality Conformity Report Vol I 2011-2014 TIP
Air Quality Conformity Report Vol II 2011-2014 TIP